MTSCO has been supplying industrial tubing to the heat exchanger/ oil and gas industry for more than a decade. In recent years, we have continued to make breakthroughs in the field of coiled tubing, downhole control lines, and chemical injection control lines. Our coiled tubing has been successfully used in kinds of heat exchanger, certain harsh subsea and downhole conditions, and through continuous research and development, is able to meet the stringent quality requirements of the heat exchanger industry and other industries.
Send InquirySince 2006, MTSCO has been a dedicated provider of coiled tubing services, delivering high-quality products to the global geothermal, heat exchanger, shipbuilding, oil, and gas industries. Our extensive range includes materials such as 304, 316, 2205, 2507, alloy 625, 825, and more, manufactured in accordance with various international standards. In recent years, we've achieved significant advancements in control line tubing, downhole control lines, and chemical injection control lines, focusing on the production of welded/seamless continuous tubulars, single/multi-core control lines, capillary tubing, and more.
Grade: | 31803/2205, 32750/2507, TP304/304L,316/316L, 347/347H, Alloy 625/825/C276/600/601,etc |
Standard: | ASTM A269/A213/A789/B704/B163,etc |
Size: | OD: 2.38-25.4mm |
WT: 0.51-2.65mm | |
Length: | ≤10000m |
Type: | Seamless/Welded |
Hole Count: | Single/Multi Core |
Certificate: | ISO/CCS/DNV/BV, etc. |
Inspection: | NDT; Hydrostatic test |
UNS Designation | C | Si | Mn | P | S | Cr | Ni | Mo | N | Cu |
max | max | max | max | max | ||||||
S31803 | 0.03 | 1 | 2 | 0.03 | 0.02 | 21.0 - 23.0 | 4.5 - 6.5 | 2.5 - 3.5 | 0.08 - 0.20 | - |
2205 | ||||||||||
S32205 | 0.03 | 1 | 2 | 0.03 | 0.02 | 22.0 - 23.0 | 4.5 - 6.5 | 3.0 - 3.5 | 0.14 - 0.20 | - |
S32750 | 0.03 | 0.8 | 1.2 | 0.035 | 0.02 | 24.0 - 26.0 | 6.0 - 8.0 | 3.0 - 5.0 | 0.24 - 0.32 | 0.5 max |
2507 | ||||||||||
S32760 | 0.05 | 1 | 1 | 0.03 | 0.01 | 24.0 - 26.0 | 6.0 - 8.0 | 3.0 - 4.0 | 0.20 - 0.30 | 0.50 -1.00 |
Reduced installation labor costs: Installing continuous lengths of pipe with coiled tubing proves more time-efficient and reliable compared to connecting multiple shorter lengths of pipe. This not only streamlines the installation process but also contributes to cost savings in labor.
PROCESS:
Manufacturing Experience
Plant Area
Max Diameter of Welded Pipe
Annealing Furnace Length
Nickel Alloy
NI-MO: N10001,N10665,N10675...
NI-CR-MO: N10276,N06022,N06035,N06455,N06002...
NI-CR-MO-CU: N06030,N06200,N08031,N08825,N08020...
NICR-MO-W: N06230...
NICKEL: N02200,N02201...
NI-CU: N04400,N05500...
NI-CR-FE: N06600,N06601,N06690,N08800,N08810,N08811...
NI-CR-MO-NB: N06625,N07718...
Austenitic
304/L/H/N, 316/L/H/N/Ti, 321/H, 309/H, 310S, 347/H, 317/L, 904L...
Duplex Steel
31803, 32205, 32750, 32760...
Cobalt Alloy
Alloy 188/ UNS R30188, Alloy L-605/ UNS R30605, Alloy S-816, Alloy 6B, UMCo50, FSX-414, MP-159...
Send Inquiry by feedback form learn more about product detail, price, etc.
Your email address will not be published. Required fields are marked *